Brandenburg Rooftop Concerto 08/16/13
A lot of earthmoving today. Front slope has been graded and leveled some, and the concrete crusher continued to reduce the big piles to mounds of concrete powder. I found out that the plan is to use the ground-up concrete as a base to fill in the holes, with soil layered on top.
They still have foundations to remove, and the back radiology rooms and sub-basement are still there, for some reason.
Olympus E-M5, Panasonic 20/1.7, 26 shots stitched in Hugin.
Date: 08/16/2013
Owner: Paul Braun