Brandenburg Rooftop Concerto 08/07/13
Most of the above-ground structure is gone. The front steps and driveway were removed. The next week should be a lot of rubble removal, foundation removal, and grading. The laundry building still needs to come down, as does the Medical Arts Building on the corner, but Wound Care needs to be removed from the building before that happens.
Olympus E-M5, Panasonic 20/1.7, 16 shots stitched in Hugin.
Date: 08/07/2013
Owner: Paul Braun